-
False Bay (South). Progress report for the period 23/7/1970 to 22/7/1971.
No text - one plan only, depicting the location and engineering surveyor's details for a planned earth fill embankment, to be constructed within SML 449 on the seaward side of the proposed primary evaporation pond for a 360,000 tons per annum saltworks.-
Document
Published: 23 Jun 1970
-
Point Paterson. Annual and final reports to licence expiry/full surrender for the period 2/6/2003 to 1/6/2006.
Evaluation of the feasibility of re-establishing salt production facilities at the abandoned solar salt works on the tidal flats at Point Paterson, 15 km south-east of Port Augusta, has been undertaken by the current local SA major salt producer...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Midgee (latterly part of the Cowell JV Project). Annual reports for the period 26/11/2003 to 24/3/2019.
An area of the northern Cowell Hills was taken up to explore for possible economic basement-hosted copper-gold mineralisation of epigenetic style, analogous to that found at the Ernest Henry deposit, which may be associated with magnetic anomalies and...-
Document
Published: 08 May 1919
-
Redcliff. Progress reports to licence surrender, for the period 12/1/1976 to 21/10/1977.
Reports provide a history of the assistance given by the licensee and State Government officials to Dow Chemical Co. to enable their re-assessment of the viability of the proposed Redcliff Petrochemical Plant and associated raw material sources.-
Document
-
False Bay. Progress reports to licence expiry/renewal, for the period 1/7/1969 to 30/6/1971.
Site investigations of the coastal area abutting False Bay, immediately north of Whyalla, were undertaken by BHP's Industrial Minerals Div. to gauge the feasibility of expanding their Whyalla Salt Works from its existing 60,000 tons per annum...-
Document
Published: 07 May 1970
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Cultana basement regional geology 3D Model.
The Cultana basement 3D Geological Model covers a region which includes the Roopena, and western half of the Cultana, 1:100,000 mapsheet areas. The subsurface geology that has been modelled comprises a succession of deformed Palaeoproterozoic...-
Model
- PDF,
- ZIP
-
Murninnie Beach (south of Whyalla). Progress and technical reports for the period 12/3/1971 to 10/6/1972.
Site investigations of part of the coastal area south of Whyalla were undertaken by BHP Minerals Div. as part of overall studies addressing the possibility of expanding their Whyalla Salt Works. Field inspections of the area behind Murninnie Beach...-
Document