-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [South] (part of the Mount Ive Project). First annual report, for the period 20/6/2014 to 19/6/2015.
An area centred on the southern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style mineralisation, as well as for possible...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Kolendo [not "Taringa"] (part of the Menninnie Zinc Project). Annual reports for the period 21/2/2011 to 20/2/2013.
An area located adjacent to the southern margin of the Gawler Ranges, that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its southern boundary lies approximately 15 km north-east of the Menninnie Dam Pb-Zn-Ag...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gairdner - Unalla Hill (part of the Mount Ive Project). Annual reports for the period 7/6/2013 to 6/6/2015.
A licence consisting of three separate small sub-blocks located on the northern part of Mount Ive Station is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Ive [North] (part of the Mount Ive Project). Annual reports for the period 21/06/2013 to 20/06/2015.
An area centred on the northern part of Mount Ive Station and adjacent to the southern shoreline of Lake Gairdner is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal...-
Document
-
Data release [made at SA Director of Mines' discretion] : Tanner (part of the Mount Ive Project). First annual report for the period 01/8/2014 to 31/7/2015.
A licence area centred on Tanners Dam which is located ~26 km south-west of Lake Gairdner is being explored primarily for buried economic, basement hosted and structurally controlled hydrothermal Ag-Zn-Pb and epithermal Au-Ag-(Cu) vein style...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-12 - Corunna Station, north-eastern Eyre Peninsula, structurally controlled Mesoproterozoic epithermal Ag-Au and base metal prospects. Drilling final report.
Musgrave Minerals Ltd (MGV) is the holder of the subject EL 5497 Corunna North, located in the southern Gawler Ranges approximately 65 km west of Port Augusta and 10 km north of Iron Knob, where it is exploring for economic base and precious metal...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Yarna Hill. Annual reports to licence expiry/full surrender for the period 19/11/2002 to 4/12/2010.
An area of sparse basement outcrop situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data...-
Document
-
Palthrubie Hill. Annual reports to licence expiry/full surrender for the period 21/5/2002 to 4/12/2010.
An area situated to the west of Lake Acraman in the central Gawler Ranges district was taken up to explore for possible economic Olympic Dam style mineralisation, based on the licensee's evaluation of past drillhole data which indicated that a number...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Lake Gairdner South [SW margin]. Annual reports to licence expiry/renewal, for the period 25/10/2002 to 24/10/2007.
An area flanking the south-western margin of Lake Gairdner was taken up by Rudy Gomez to explore for possible economic buried precious and base metal epithermal mineralisation of Olympic Dam or Tunkillia style within volcanic rocks of the Proterozoic...-
Document
Published: 05 Apr 1908
-
Data release - as updated [made at SA Director of Mines' discretion] : Kolendo (part of the Menninnie Zinc Project). Annual reports for the period 27/7/2009 to 26/7/2012.
An area located adjacent to the southern margin of the Gawler Ranges that includes some exposures of Mesoproterozoic Gawler Range Volcanics (GRV), and which at its south-eastern corner lies approximately 12 km north-west of the Menninnie Dam Pb-Zn-Ag...-
Document
-
Toondulya Bluff. Annual reports to licence expiry/full surrender, for the period 14/1/2004 to 14/7/2013.
A licence area centred about 100 km north-east of Streaky Bay township, on the south-western perimeter of the Gawler Ranges, was taken up to explore for possible economic buried IOCG mineralisation or Tunkillia stye fracture controlled lode gold...-
Document
Published: 06 Nov 1913
-
RB 2016/00030 Mineral Systems Drilling Program in the southern Gawler Ranges, South Australia.
The Mineral Systems Drilling Program (MSDP) was a $3.5M cash and $4.11M in-kind collaborative drill program involving government, researchers, service providers and the minerals industry. The objective of the MSDP was to further the understanding of...-
Document
Published: 01 Sep 2017