-
2021 Cooper Basin 2Dcubed PrSDM Repro, Pseudo 3D Volume Part 5 of 10.
TGS has reprocessed South Australia’s extensive open-file 2D seismic database over the Cooper Basin, using their 2Dcubed technology to generate Pre-Stack Time Migrated 2D and pseudo-3D outputs over the basin. Field data from 3855 lines of 2D seismic...-
Document
Published: 13 Apr 2023
-
2021 Cooper Basin 2Dcubed PrSDM Repro, Merged 2D3D Volume Part 1 of 10.
TGS has reprocessed South Australia’s extensive open-file 2D seismic database over the Cooper Basin, using their 2Dcubed technology to generate Pre-Stack Time Migrated 2D and pseudo-3D outputs over the basin. Field data from 3855 lines of 2D seismic...-
Document
Published: 28 Feb 2023
-
PPLs 206, 208 and 215 Annual Report - 2018.
This report covers activities undertaken within PPLs 206, 208 and 215 during the 2018 calendar year.-
Document
Published: 30 Aug 2019
-
2021 Cooper Basin 2Dcubed PrSDM Repro, Pseudo 3D Volume Part 7 of 10.
TGS has reprocessed South Australia’s extensive open-file 2D seismic database over the Cooper Basin, using their 2Dcubed technology to generate Pre-Stack Time Migrated 2D and pseudo-3D outputs over the basin. Field data from 3855 lines of 2D seismic...-
Document
Published: 13 Apr 2023
-
2021 Cooper Basin 2Dcubed PrSDM Repro, Merged 2D3D Volume Part 7 of 10.
TGS has reprocessed South Australia’s extensive open-file 2D seismic database over the Cooper Basin, using their 2Dcubed technology to generate Pre-Stack Time Migrated 2D and pseudo-3D outputs over the basin. Field data from 3855 lines of 2D seismic...-
Document
Published: 28 Feb 2023
-
2021 Cooper Basin 2Dcubed PrSDM Repro, Merged 2D3D Volume Part 4 of 10.
TGS has reprocessed South Australia’s extensive open-file 2D seismic database over the Cooper Basin, using their 2Dcubed technology to generate Pre-Stack Time Migrated 2D and pseudo-3D outputs over the basin. Field data from 3855 lines of 2D seismic...-
Document
Published: 28 Feb 2023
-
2021 Cooper Basin 2Dcubed PrSDM Repro, Pseudo 3D Volume Part 6 of 10.
TGS has reprocessed South Australia’s extensive open-file 2D seismic database over the Cooper Basin, using their 2Dcubed technology to generate Pre-Stack Time Migrated 2D and pseudo-3D outputs over the basin. Field data from 3855 lines of 2D seismic...-
Document
Published: 13 Apr 2023
-
South Australia Cooper Basin Production and Processing Operations - Environmental Significance Assessment - Archived.
There is no abstract created for this record-
Document
Published: 31 Aug 2003
-
2013 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 19 Feb 2016
-
PPLs 206, 208 and 215 2014 Annual Report.
This report covers activities conducted within PPLs 206, 208 and 2105 for the 2014 calendar year.-
Document
Published: 21 Mar 2016
-
South Australia Cooper Basin Production and Processing Operations - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 Feb 2014
-
South Australian Cooper Basin Operators Drilling and Well Operations - Environmental Impact Report. Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 28 Feb 2003
-
Beach Petroleum Cooper Basin Petroleum Production Operations - Environmental Impact Report. Archived.
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope. An EIR must identify any events associated with the...-
Document
Published: 30 Nov 2003
-
PPLs 203, 207, 208, 209, 211, 213, 214, 215, 217, 218, 221, 240, 242, 243, 251, 258 Annual Report - 2016.
This report covers activities undertaken within PPLs 203, 207, 208, 209, 211, 213, 214, 215, 217, 218, 221, 240, 242, 243, 251, 258 during the 2016 calendar year.-
Document
Published: 28 Jul 2017
-
PEL 115 Regional Geologic Studies - Patchawarra Fm Chronostratigraphy.
Purpose of study The initial findings of the chronostratigraphic studies undertaken near and within the PEL 115 permit were reported to the PEL 115 SA Cooper Basin Joint Venture at the JV Meeting held in Adelaide on 18th August, 2004. At the time of...-
Document
Published: 01 Nov 1904
-
PEL 111-104 Regional Prospectivity Review and Recommended Forward Geotechnical Studies.
The purpose of this report was to provide an audit for the Joint Venture of current understanding of prospectivity and to recommend the necessary geotechnical studies required which will contribute to the discovery and exploitation of oil and gas...-
Document
Published: 01 Nov 1904
-
SFL 10 Annual Report - Year 2.
This report covers activities conducted within SFL 10 during Term 1 Year 2 for the period 13/03/2015 - 12/03/2016.-
Document
Published: 08 Jul 2016
-
SFL 8 Annual Report - Year 3.
This report covers activities conducted within SFL 8 during Term 1 Year 3 for the period 20/11/2015 - 19/11/2016.-
Document
Published: 21 Apr 2017
-
2015 Annual Report of South Australian Cooper Basin Joint Venture (SACBJV) Operations.
This report covers: -SACBJV exploration, production and processing operations. -Pipelines operated under Pipeline Licences PL 5 (Ballera to Moomba), PL 9 (Stokes to Mettika) and PL 15 (Moon to Kerna). -Emergency response exercises conducted during...-
Document
Published: 21 Apr 2017
-
SFL 9 Annual Report - Year 3.
This report covers activities undertaken within SFL 9 during Year 3 for the period from 10/01/2016 - 09/01/2017.-
Document
Published: 28 Jul 2017