-
Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Kingston (South-East). Progress reports [until the commencement of WMC's Kingston Coal Project multi-licence joint reporting, approved from 1/5/1980] for the period 21/8/1979 to 20/2/1980.
Continuing reconnaissance and evaluation of potentially economic Tertiary or Jurassic age coal seams, both known to be present in the Naracoorte and Kingston areas, has consisted of the drilling and geophysical logging of 92 open rotary holes...-
Document
-
Moorlands. Progress reports and final report to licence expiry/renewal, for the period 10/9/1976 to 9/9/1978.
Work consisted of gathering all available information and advice on, and assessing the problems associated with, treatment of the Moorlands deposit low rank brown coal to make it a fuel suitable for use in cement manufacture within a newly constructed...-
Document
-
Mypolonga, Oakbank and Sturt Vale (part of CRA's Murray Basin Project). Final report at licences' joint full surrender, for the period 7/7/1980 to 20/6/1983.
As part of ongoing exploration of three areas in the western and northern Murray Basin, an open-file data review, in conjunction with the acquisition and interpretation of previous aeromagnetic and gravity data, provided a basis for CRAE's siting of 5...-
Document
Published: 04 Mar 1983