-
Mount Ive (part of the Eyre Peninsula Uranium Joint Venture Project). Final report at licence expiry/full surrender, for the period 19/4/2006 to 18/10/2013.
The stated exploration strategy for the Joint Venture's Eyre Peninsula Project tenements was to explore predominantly for gold and copper, with uranium as a secondary focus. Regional programmes of calcrete geochemical sampling were to be used to...-
Document
-
Cocata (part of the Eyre Peninsula Uranium Joint Venture Project). Final report at licence full surrender, for the period 9/2/2007 to 22/9/2010.
An area located approximately 25 km west-southwest of Wudinna has been explored for possible economic epigenetic / hydrothermal gold and base metal deposits formed within buried Proterozoic basement rocks, as well as latterly for possible economic...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
RB 2016/00030 Mineral Systems Drilling Program in the southern Gawler Ranges, South Australia.
The Mineral Systems Drilling Program (MSDP) was a $3.5M cash and $4.11M in-kind collaborative drill program involving government, researchers, service providers and the minerals industry. The objective of the MSDP was to further the understanding of...-
Document
Published: 01 Sep 2017
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
Data release - as updated [made at SA Director of Mines' discretion] : Lock [Coalfield]. Annual reports and technical reports for the period 24/5/1993 to 26/10/2014.
The Lock Jurassic sub-bituminous coal deposit was discovered by the South Australian Department of Mines and Energy in 1977. The Lock Coal deposit lies within the eastern portion of the Polda Basin on the Eyre Peninsula. The deposit covers an area of...-
Document
Published: 01 Nov 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
The Western Eyre Peninsula JV Project. Data release made in lieu of submitting a first partial surrender report for EL 2662, and a final report at the surrender of EL 2711: joint annual reports for the period 26/8/1994 to 11/4/2002.
A high amplitude, linear N-S trending magnetic feature, dubbed the Coffin Bay Magnetic Anomaly, and the recognition of basement lithologies analogous to those of metallogenically prospective late Archaean terranes in Canada, were the impetus for...-
Document
Published: 17 Jun 2002
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
Mount Ive and Corrobinnie (part of the Eyre Peninsula Uranium Joint Venture Project). Joint first partial surrender report, for the period 19/4/2006 to 11/7/2010.
Exploration of the Tertiary Thurlga Palaeochannel for possible roll front type sedimentary uranium mineralisation has occurred principally on EL 3546 Mount Ive, the northern half of which has now been relinquished along with a tiny part of EL 3833...-
Document
Published: 28 Feb 2011
-
Brimpton Lake. Data release made in lieu of submitting a second partial surrender report at licence expiry/renewal : annual reports for the period 22/10/2001 to 21/10/2004.
Following the farm-in of Anglo American Exploration to this tenement in March 2003, new activity has focussed on the rapid definition of drilling targets in a search for possible Archaean basement volcanic or sediment-hosted base metal massive...-
Document
Published: 21 Oct 2004