SADM/Amdel Project no. IC 1/1/97: Chemical treatment of bore water. Progress reports 1-10 for the period 4/7/1966 to 31/5/1969; and SADM/Amdel Project no. CM 2/12/1: Desalination studies. Progress reports 1-7 for the period 30/6/1969 to 29/2/1972.
A survey of analyses of Adelaide Sub-basin groundwater has shown that the removal of calcium and magnesium bicarbonates would give a 'soft' product water containing 500-700 ppm TDS, mainly sodium chloride. Trial operation of a continuous ion exchange...-
Document
-
Gypsum deposit evaluation, Hundred of Everard - Mineral Claim 3131. RAB drilling results.
There is no abstract created for this record-
Document
-
Gypsum deposit evaluation, Hundred of Everard - Mineral Claim 3117. RAB drillhole logs.
There is no abstract created for this record-
Document
Published: 20 Jan 2000