SADM/Amdel Project no. IC 1/1/97: Chemical treatment of bore water. Progress reports 1-10 for the period 4/7/1966 to 31/5/1969; and SADM/Amdel Project no. CM 2/12/1: Desalination studies. Progress reports 1-7 for the period 30/6/1969 to 29/2/1972.
Downloads
Name | Description | Download | Select |
---|---|---|---|
ENV01591.pdf |
About this record
Record No | mesac10749 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | External Publication - Laboratory Analyses |
Contributor | Amdel Ltd;Industrial Chemistry Section;Chemical and Metallurgical Engineering Section |
Sponsor | Commonwealth Scientific and Industrial Research Organization;South Australia. Department of Mines |
Tenement | |
Tenement Holder | |
Operator | |
Geological Province | St Vincent Basin |
Mine Name | |
Stratigraphy | |
Commodity | gypsum |
Notes |
Notes: Includes: - Weiss, D.E., 1967. Cost estimate for continuous ion-exchange treatment of an alkaline bore water. CSIRO Div. of Applied Chemistry. Appendix A in: Chemical treatment of bore water. Progress report no. 3. Contains copy of...
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac10749 |
Citation | Blesing, N.V.;Melbourne, J.D.;Weiss, D.E.;Walker, W.;Williams, G. SADM/Amdel Project no. IC 1/1/97: Chemical treatment of bore water. Progress reports 1-10 for the period 4/7/1966 to 31/5/1969; and SADM/Amdel Project no. CM 2/12/1: Desalination studies. Progress reports 1-7 for the period 30/6/1969 to 29/2/1972. External Publication - Laboratory Analyses https://pid.sarig.sa.gov.au/document/mesac10749 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[138.5,-36.5],[140.5,-36.5],[140.5,-34.5],[138.5,-34.5],[138.5,-36.5]]]} |
Purpose | |
Lineage |