-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 7/11/2008 to 6/11/2011.
No field work was undertaken during licence Year 7, but Stellar instead did a review of the Cowell area's prospectivity for Tertiary palaeochannel-hosted sedimentary uranium mineralisation. Previous drilling data for the local Pirie Basin sediments...-
Document
Published: 05 Dec 1911
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Coober Pedy. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2009.
In a search conducted over an area lying beyond but near the southern edge of Coober Pedy township, looking primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits of predominantly IOCG type, the licensee Nova...-
Document
Published: 31 Jan 1910
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917
-
Harris Bluff. Annual reports plus final report to licence expiry/full surrender, for the period 21/6/2006 to 18/10/2015.
An area located immediately north of Lake Gilles and centred on Harris Bluff in the Uno Range was taken up to explore for possible buried unconformity style uranium mineralisation which could have formed at the base of the Corunna Conglomerate, and...-
Document
Published: 29 Sep 1915
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1977 to 10/8/1979.
At the commencement of the term of the subject licence, exploratory/appraisal diamond drilling using a single rig was continued on the Olympic Dam gravity anomaly by the licensee for gathering more geological information to use to try to understand...-
Document
-
RB 2016/00027 The Gluepot Granite: CA-TIMS geochronology and constraints on the timing of deformation on northeastern Eyre Peninsula.
The Gluepot Granite is a heterogeneous granite comprising coarse-grained porphyritic granite and medium-grained equigranular granite, as well as late stage pegmatite and aplite phases. It occurs as a large pluton intruding the c. 1755 Ma Moonabie...-
Document
Published: 01 Jun 2017
-
RB 2008/00011 Definition of the Cultana Subsuite, Gawler Craton: a high level felsic Hiltaba Suite age intrusive with hydrothermal alteration and brecciation.
This paper provides a formal definition of the Cultana Subsuite, outlining the igneous petrology of the intrusion, its geochemical characteristics, and the nature of hydrothermal alteration and brecciation affecting the rocks. The Cultana Subsuite is...-
Document
Published: 01 Sep 2008
-
Krystal (part of Edward Creek Project). Annual reports to licence expiry/full surrender for the period 14/2/2002 to 13/2/2005.
Diamond exploration carried out within an area lying to the south-southwest of the Peake and Denison Ranges has aimed to find potential kimberlite sources for nine diamonds, previously recovered by De Beers from surface bulk samples, that were...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Joint annual reports for the period 1/1/2008 to 31/12/2010.
In an agreement with Oxiana, Toro Energy Limited has Uranium rights covering the Project area. In 2008, exploration activities within tenements comprising the Mount Woods Project targeted iron oxide copper gold (IOCG) style mineralisation. Drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 3 of 4 ].
During July 2000, the Minotaur Resources Ltd / Billiton Exploration Australia Pty Ltd mineral exploration alliance entity agreed to farm into the four Coober Pedy Project tenements held by Normandy Exploration (80%), Sons of Gwalia (13%) and Sabatica...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 4 of 4 ].
In 2006, work completed on the Prominent Hill Project in the reporting period included drilling of 17 RC holes for 4,255 m and 46 mud/diamond holes at Prominent Hill prospect for 14,301.5 m. The drilling at Prominent Hill intersected wide zones of...-
Document