-
Data release [made at SA Director of Mines’ discretion] : Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Annual reports for the period 24/9/2001 to 23/9/2005.
The buried Menninnie Dam zinc-lead(-silver-copper) deposit, located approximately 55 km north of Kimba on northern Eyre Peninsula, and sitting adjacent to the south-eastern margin of the Gawler Ranges, is being evaluated for its future commercial...-
Document
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 1917
-
RB 2007/00004 Director of Mines' Exploration Licence Application 383 (Sleaford Bay). Report of results.
This report presents the results of exploration on the Director of Mines E.L.A. 383 at Sleaford Bay during November, 2006. A number of samples of Carnot Gneiss, Hutchison Group and Donington Suite granitoids were collected from coastal exposures at...-
Document
Published: 01 Jan 2007
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document