-
Prospect Hill. Progress reports and annual reports to licence expiry/renewal, for the period 23/11/1990 to 22/11/1994.
Continued evaluation of possible economic primary tin oxide mineralisation in the Prospect Hill area, 20 km north-west of Moolawatana Homestead, concentrated on infill channel geochemical sampling and mineragraphic/petrogenetic sampling of costeans...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Arkaroola. Annual reports for the period 5/12/2008 to 3/12/2015.
During the 2008-2009 licence year, most of the new work done consisted of appraisal rotary mud drilling at Four Mile East (112 holes for 24,460 m) and Four Mile West (113 holes for 19,120 m), with the addition of one NQ diamond cored hole (AKC093) for...-
Document
Published: 20 Jan 1916
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 1909
-
Amdel Ltd project - Fluid inclusion studies of South Australian ores, rocks and minerals. Progress reports nos 1 to 6 for the period 7/5/1976 to 3/4/1980.
In September 1975 the South Australian Department of Mines accepted a proposal from Amdel Ltd to purchase and set up some microthermometry apparatus, in order to commence fluid inclusion studies of selected rock types and minerals in South Australia....-
Document