-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-42, Talia Hill area (Harris Greenstone Domain) copper-nickel and platinum group elements mineral prospects. Project final report.
In December 2005 Mithril Resources completed five RC percussion drillholes totalling 682 m on three 100 m - spaced traverses, as one of the approved PACE Initiative Year 2 subsidised drilling projects. This drilling was intended to test a surface TEM...-
Document
-
Glenloth (part of the Tarcoola Joint Venture Project). First partial surrender report, for the period 11/7/2003 to 2/11/2009.
When exploring for nickel sulphide mineralisation within buried ultramafic rocks of the Archaean Lake Harris Greenstone Belt, over TEMPEST aerial EM anomalies lying ~16 km north-west of Yerda Outstation, Mithril Resources carried out a ground EM...-
Document