-
Progress and final reports PEL 3 SA and PEP 64 (Vic.) 1969-1971.
Operations which encompassed ground in SA and Victoria comprised two major projects, the Sunset seismic survey (190 line-km in SA), and a three hole drilling programme (Nadda 1 in SA - see Env 1350 for well completion report). The survey showed the...-
Document
Published: 01 Jan 1971
-
PEL 16. Progress and technical reports for the period 16/6/80 to 15/5/90.
Reports document the petroleum exploration history and search philosophy behind PEL 16 over two licence terms, and provide some new raw and interpretative geophysical and geochemical data based on the conduct of 5 seismic surveys and the drilling of 2...-
Document
Published: 15 May 1990
-
RI 041 Hydrocarbon Potential of Western Murray Basin and Infrabasins
The Murray Basin is a shallow, saucer-shaped Tertiary basin covering an area of 120 700 square miles extending from the western foot of the Snowy Mountains in New South Wales and Victoria to the Mount Lofty Ranges in South Australia. Geophysical work...-
Document