Continuous solvent extraction studies.
Work carried out at Amdel and at the Colorado School of Mines' Research Institute has indicated that both a two solvent system (EHPA and TBP or DBBP) and a three solvent system (EHPA, DBBP and Alamine 336) of cationic exchangers are satisfactory for...-
Document
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
RB 2006/00023 Chinese electrogeochemical CHIM method: Field Trials 2005, South Australia
A version of the Russian-invented CHIM electro-geochemical prospecting technique, which has lately been developed at Guilin University, China, was trialled in field surveys conducted at the Challenger gold mine, and at the Kalkaroo Cu-Au-Mo and Goulds...-
Document
Published: 01 Dec 2006
-
RB 2009/00003 Chinese CHIM electrogeochemical method: [results of] field trials [during] 2007, [within] South Australia.
A version of the CHIM electro-geochemical prospecting technique that has been developed at Guilin University, China, was trialled in South Australia during August 2007 in field surveys conducted at the Challenger gold mine, at the Tunkillia gold...-
Document
Published: 01 Feb 2009
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document