-
Landsat thematic mapper study of the Yardea Dacite, Gawler Range Volcanics, YARDEA 1:250 000 scale map sheet.
The South Australian Department of Mines and Energy (SADME) commissioned the South Australian Centre for Remote Sensing (SACRS) to undertake a digital analysis of Landsat Thematic Mapper (TM) data in an attempt to locate prospective areas for...-
Document
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Bindabu Bore. Annual and final reports to licence expiry/full surrender for the period 19/11/2007 to 18/11/2009.
Exploration for possible economic iron oxide - associated copper-gold (IOCG) deposits formed in buried Archaean to Proterozoic basement of the western Mabel Creek Ridge has consisted only of desktop prospectivity studies carried out by a consultant....-
Document
Published: 30 Apr 1910
-
Cooinchina Creek (synonym: the West Lake Eyre Project). Annual reports and final report to licence expiry/full surrender, for the period 21/9/2007 to 20/9/2010.
An area located approximately 50 km east of William Creek and abutting the western shoreline of Lake Eyre North was taken up to explore for possible concealed IOCG style base metal and uranium deposits, that could have formed in buried Archaean to...-
Document
Published: 30 Jun 1910
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 1903
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports to licence expiry/renewal, for the period 1/9/2005 to 31/8/2010.
An area centred ~230 km north-west of Ceduna, in the far north-eastern corner of the Nullarbor Plain, and lying just south of the Ooldea railway siding on the Trans Australian Railway line, is being explored for possible economic buried deposits of...-
Document
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909