Outalpa Hill. Data release made upon the full surrender of a subsequent licence : progress reports to licence expiry, for the period 15/7/1988 to 8/8/1994.
Exploration for possible economic gold occurrences in an area surrounding Outalpa Hill in the Olary Ranges, 25 km north of Manna Hill township, has been conducted initially by a private prospecting syndicate with the assistance of industry...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Boolcoomata, Macdonald Hill, Mingary, Bulloo South / Bulloo Creek, Drew Hill and Wompinie (the Drew Hill Project). Separate and joint annual reports for the period 30/9/2003 to 9/1/2008.
Three adjacent but separate exploration licences, ELs 3136, 3137 and 3138, together covering 491 square km of ground located north-east of Olary and also surrounding Mingary, were initially granted to Exco Resources NL (Exco) at the end of September...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Outalpa. Annual reports for the period 9/7/2013 to 8/7/2018.
An area comprising three sub-blocks that cover most of the western side of the Outalpa Inlier in the Olary district was initially explored for possible buried epigenetic White Dam style primary gold mineralisation. In 2015, with a change of licence...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
The Needles. Progress reports and annual report to licence expiry/renewal, for the period 22/6/1973 to 21/6/1975.
Ongoing exploration for economic base and precious metals in the Blue mine area at the eastern end of the Umberatana Syncline has comprised detailed, 1:5000 scale prospect mapping, preparation of a preliminary new tectonic and structural analysis...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 25/7/2007 to 15/8/2013, and the "Curnamona South Project" annual report for the period 1/1/2017 to 31/12/2018.
During licence year 6, the commencing year of renewed EL 3895 Cutana, no work took place because Havilah's RC drilling rig, along with all company personnel, were fully occupied on completing the mining feasibility evaluation drilling programmes...-
Document
Published: 15 Apr 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 1912