-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
South Eagle. Data release made at transfer of licence ownership : annual reports for the period 17/9/1997 to 16/9/2000.
The majority of mineral exploration undertaken in the South Eagle area, centred 40 km north-east of Olary, has targeted stratabound Pb-Zn-Ag, stratabound massive sulphide Cu-Zn-Co-Mn, and Cu-Au mineralisation that may have formed in Proterozoic rocks...-
Document
-
Paralana Creek and Four Mile Creek [part of the Paralana Plains Joint Venture area]. Progress reports for the period 15/4/1968 to 14/4/1971.
A licence area covering the flat alluvial Paralana Plains extending out eastwards from the northern Flinders Ranges was taken up by the the consortium of Exoil NL, Petromin NL and Transoil NL to explore for possible economic buried occurrences of...-
Document
-
Preliminary [mining] feasibility study [for the] Lake Frome uranium orebodies. Final report.
Report presents the results of a preliminary study of the commercial feasibility of producing yellowcake from the Beverley sedimentary uranium deposit located near Lake Frome. All of the available drillhole data for this deposit was examined and...-
Document
-
South Eagle. Progress and technical reports for the period 21/12/1977 to 2/11/1984.
TARGET: Ongoing evaluation of the Honeymoon deposit. EXPLORATION: Pilot wellfield drilling (48 holes) on a 60 m by 30 m grid over the eastern half of the deposit, hydrological investigations, metallurgical testing, and in-situ push-pull leaching...-
Document
Published: 10 Nov 1984