South Eagle. Progress and technical reports for the period 21/12/1977 to 2/11/1984.
Published: 10 Nov 1984
Created: 13 Nov 2024
Revised: 13 Nov 2024
Author: Goldney, L.H.;Brunt, D.A.;Lackey, J.A.;Binch, I.R.;Kightley, G.;Estill, W.;Wecker, R.;Morris, L.J.;Burns, S.;Mielnik, V.;Curtis, J.L.
TARGET: Ongoing evaluation of the Honeymoon deposit. EXPLORATION: Pilot wellfield drilling (48 holes) on a 60 m by 30 m grid over the eastern half of the deposit, hydrological investigations, metallurgical testing, and in-situ push-pull leaching...
TARGET: Ongoing evaluation of the Honeymoon deposit. EXPLORATION: Pilot wellfield drilling (48 holes) on a 60 m by 30 m grid over the eastern half of the deposit, hydrological investigations, metallurgical testing, and in-situ push-pull leaching trials. RESULTS: The uranium ore is fully amenable to solution mining by alkali leaching.