RB 88/00014 Petroleum exploration and development in South Australia (5th edition).
In South Australia since 1958, 140,400 km of seismic have been recorded (75,500 onshore) and 882 wells drilled (of which 16 are offshore wildcats and 238 are development wells). Exploration and development have taken place in three distinct phases....-
Document
Published: 01 Mar 1988
-
RB 93/00053 South Australian resources. Technical sessions. Abstracts.
Abstracts include: Conference presentation summary for the 1993 MESA BARTON and Colona drilling programmes (both forming part of the South Australian Exploration Initiative) - [technical rationale, planned drillholes and preliminary results]....-
Document
Published: 03 Dec 1993
-
RB 89/00018 Petroleum exploration and development in South Australia (6th edition).
There is no abstract created for this record-
Document
Published: 01 Apr 1989
-
EPP 5, Eucla, Duntroon and Bight Basins (Ceduna Terrace). Progress and technical reports for the period 20/9/68 to 13/1/76.
The programme of work pursued over EPP 5 was as follows: Permit Year 1 - interpretation of 407 line km of regional reconnaissance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
Published: 13 Jan 1976
-
PEL 4, Eucla, Denman and Bight Basins. Progress and technical reports for the period 13/9/68 to 18/4/74.
PEL 4 was granted to Outback Oil Co. NL on 14/11/68 to succeed the onshore part of the former OEL 33 in the Eucla Basin region, and allow continuity of exploration in a little known petroleum province. Early in licence Year One Outback Oil succeeded...-
Document
Published: 08 Apr 1974
-
EPP 11, Eucla and Bight Basins. Progress and technical reports for the period 8/11/68 to 26/4/77.
EPP 11 was taken up by Shell in mid-1968 as high risk, potentially high reward frontier acreage over very deep water (200 to 2000 metres) in the Great Australian Bight outer continental shelf / continental slope region of South Australia. At that...-
Document
Published: 26 Apr 1977
-
Final report, South Australia offshore permits SA.10 and SA.11.
The R 10 Marine Seismic Survey was conducted during March, 1976 within EPPs 10 and 11 to detail the previously indicated Galah, Kookaburra and Rosella-Jabiru leads. This survey defined three structurally sound closures, Galah, Kookaburra East and...-
Document
-
Evaluation report on South Australian deep water acreage (SA-10 and SA-11).
From the interpretation of the 1971 R 6 seismic survey data plus earlier geophysical work in the central Bight Basin region, present indications are that a 10,000-26,000 feet thick sedimentary sequence occurs in the area covered by Shell's SA-10 and...-
Document
-
Great Australian Bight Basin, offshore South Australia.
EPPs 10 and 11 currently comprise 239 graticular blocks (approximately 17 000 sq km) in the Great Australian Bight Basin. No wells have yet been drilled in these permits which lie entirely in water depths greater than 200 m and ranging down to 1 500...-
Document
-
EPP 5. 1973 evaluation report.
Following an unsuccessful attempt at farming out part of EPP 5 in late 1972, Shell resolved to continue exploring that permit area in its own right, subject to the offshore Designated Authority's approval of a variation in permit conditions, which was...-
Document
-
Geological and geophysical study in offshore Eucla Basins, Western Australia.
There is no abstract created for this record-
Document
-
EPP 5, Bight and Eucla Basins. Farmout proposal, November 1972.
This farmout proposal is directed at the Australian and overseas petroleum exploration industry, with the aim of sharing 50/50 the upcoming A$3 million risk inherent in the EPP 5 permit Years 4/5 one well drilling commitment. Shell invited 26 likely...-
Document
-
EPP 10, Eucla and Bight Basins. Progress and technical reports for the period 8/11/68 to 26/4/77.
EPP 10 was taken up by Shell in mid-1968 as high risk, potentially high reward frontier acreage over very deep water (200 to 2000 metres) in the Great Australian Bight outer continental shelf / continental slope region of South Australia. At that...-
Document
Published: 26 Apr 1977
-
PEL 33, Eucla and Denman Basins. Progress reports for the period 25/6/85 to 18/4/89.
Contains interpretation reports on satellite imagery remote sensing and reprocessed aeromagnetic data, plus other brief interpretative statements by the contract operator contained within some quarterly tenement reports.-
Document
Published: 18 Apr 1989
-
Annual and Technical Reports for EPP28.
EPP 28 covering 255 graticular blocks (approx. 16126km2) over the Ceduna Sub Basin of the Great Australian Bight area was granted to a consortium of Woodside Energy (40%), Anadarko Australia (30%) and PanCanadian Petroleum Ltd (30%) on 12/7/2000....-
Document
-
EPP 16 permit year 1. Quarterly and annual reports for the period 30/6/80 to 29/6/81.
During permit Year 1 BP carried out an in-depth review of existing Bight area exploration data, besides reprocessing 1309 line km of older seismic data (originally generated by Shell Development (Australia) Pty Ltd between 1966 and 1976), and also...-
Document
-
Scientific investigation survey, Great Australian Bight, November 1989 to March 1990. Reports.
BP Exploration Company Ltd Research Unit (Sunbury, England) flew an airborne laser fluorosensor (ALF) survey over the Great Australian Bight region during the period January-March 1990, as part of BP Australia Ltd's Australian continental shelf...-
Document
-
RB 00864 APIRA Project P298 : Bight - Duntroon Basins Study. Final report
From February 1988 to March 1990, SADME carried out a source rock geochemical analysis and palynological re-evaluation of offshore petroleum exploration well samples, and also did the final processing of 778 km of offshore seismic data that had been...-
Document
Published: 01 Jan 1991
-
Petroleum exploration and development in South Australia (4th edition).
There is no abstract created for this record-
Document