-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
Benagerie. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1979 to 9/3/1989.
TARGET: Sedimentary uranium in Tertiary sandstone, plus Olympic Dam type copper-gold mineralisation and Broken Hill or Mount Isa type stratiform base metal mineralisation in the underlying basement rocks. EXPLORATION: Stratigraphic drilling (162...-
Document
-
Ooloo mine area. Annual and final reports to licence expiry/full surrender for the period 24/1/2006 to 23/1/2009.
An area located about 110 km east-southeast of Marree was taken up initially to explore for possible economic silver and base metal mineralisation, but the scope of the search was later broadened to include assessing the prospectivity for primary and...-
Document
Published: 19 Mar 1909