-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Aurora Tank. Annual reports and final report to licence expiry/full surrender, for the period 26/3/1998 to 3/8/2006.
Exploration for Challenger - style vein gold deposits within concealed Archaean basement has been carried out in two licence subareas located on the northern part of the Commonwealth Hill pastoral lease, under a joint venture between the principal...-
Document
Published: 31 Jul 1907
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
McDouall Peak. Partial surrender reports, for the period 8/10/2012 to 7/10/2020.
Within a licence area which is centred ~100 km south-southeast of Coober Pedy, holder Quasar Resources’ primary exploration target is concealed basement-hosted IOCG style mineralisation similar to that existing at the Prominent Hill and Carrapateena...-
Document
Published: 02 May 1918
-
Mount Igy. Annual reports submitted until the commencement of licence joint reporting for the Tallaringa JV ELs, for the period 18/1/2006 to 17/1/2009.
An area centred ~150 km WSW of Coober Pedy has been explored for possible buried economic sandstone-hosted secondary uranium deposits which might have formed within northeastwards-draining tributaries of the Tertiary Tallaringa Palaeochannel. Another,...-
Document
Published: 23 Apr 1909
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Comet Outstation, Gina Outstation, Commonwealth Hill Station - Central and East, and Aurora Tank areas (the Commonwealth Hill Project). Joint annual reports for the period 15/12/2008 to 30/6/2013.
A group of contiguous exploration licences centred ~100 km south-west of Coober Pedy are being explored principally for epithermal and Challenger-style gold mineralisation hosted by covered Archaean basement rocks, as well as for any economic base...-
Document
Published: 31 Aug 1913
-
Data release [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports to licence expiry/renewal, for the period 17/2/2005 to 16/2/2010.
Tasman Resources is exploring an area that is centred about 78 km north-west of Tarcoola for possible economic buried occurrences of sedimentary roll front style uranium in Tertiary palaeochannels and nickel mineralisation in Archaean -...-
Document
Published: 19 Apr 1910
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Aurora Tank and Indooroopilly Outstation. Joint annual reports for the period 21/3/2011 to 20/3/2013.
Two separate tenements in the Challenger district which are now wholly owned by Marmota Energy Limited are being explored for possible economic buried Challenger style gold mineralisation that may be present within Archaean basement, and also, within...-
Document
Published: 12 Jul 1913
-
Commonwealth Hill. Annual reports to licence expiry/non-renewal, for the period 9/8/2012 to 8/8/2017.
An area centred ~20 km north of the Challenger gold mine has been explored for possible buried primary Challenger type basement gold lodes and also for secondary roll-front style uranium mineralisation that may be hosted in buried Tertiary fluvial...-
Document
Published: 14 Nov 1915
-
Wirrida. Progress reports and final report to licence expiry/full surrender, for the period 21/4/1980 to 6/6/1983.
A large area centred ~95 km north of Tarcoola was explored initially by grant licensee Afmeco for possible buried economic epithermal / hydrothermal / fault controlled primary uranium mineralisation that may have formed in outcropping or shallowly...-
Document
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). First partial surrender report, for the period 2/7/2007 to 1/7/2017.
Five small portions of the subject licence, with a combined total area of 143 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 1917
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). Second partial surrender report, for the period 2/7/2007 to 1/7/2019.
Two portions in the north and south of the subject licence area, with a combined total area of 45 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of...-
Document
Published: 30 Jan 1920
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 1917
-
Gina Outstation (part of the Commonwealth Hill Project). Final report at licence full surrender, for the period 1/7/2013 to 3/4/2017.
No field work was performed on the subject licence during its last year of tenure. However, this Envelope contains all of the earlier (including that collected within the last 5 years) licence-specific soil calcrete geochemical, gravity survey and...-
Document
Published: 27 May 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915