-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Mount Christie. Annual reports and final report to licence full surrender, for the period 23/2/2000 to 6/8/2002.
Interest in an area near Mount Christie Siding was stimulated by the 1993 MESA Barton Bedrock Drilling Programme, which detected anomalous gold, chromium, base metals and platinoid metals in subsurface layered ultramafics. A number of targets...-
Document
Published: 20 Nov 1902
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
White Banks. Progress and annual reports plus final report to licence full surrender, for the period 22/4/1991 to 8/2/1995.
Exploration for diamonds, undertaken in an area centred 60 km east-northeast of Lyndhurst which had not been searched for this commodity previously, comprised the acquisition of aeromagnetic/radiometric and helimag surveys, and gravel and loam...-
Document