PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document
-
Data release [made at SA Director of Mines' discretion] : Tumby Bay. Annual reports [to the 24/11/2006 commencement of the Eyre Peninsula Project licences' combined reporting status] for the period 18/1/2002 to 17/1/2007.
Exploration Licence 2887 Tumby Bay was taken out to cover prospective magnetite rich Banded Iron Formations (BIF) close to the eastern coast of the Eyre Peninsula. Potential was seen for a magnetite concentrate export operation taking advantage of...-
Document
Published: 05 Mar 1907
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.
For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...-
Document
Published: 14 Jun 1917
-
Warrina North, Warrina South, Mount Brady, Yarrabolina Hill, Mount Woods and Kangaroo Dam (the Mount Woods JV Project). Joint annual reports [on JV partners' independent exploration programmes] for the period 1/5/2010 to 31/1/2017.
During the 2011-2012 project reporting period, exploration activities within the Mount Woods Project area which were conducted by OZL primarily targeted IOCG style mineralisation. Work included: · a continuation of office-based target generation and...-
Document
-
Data release - as updated : Robin Rise. Annual reports plus final report to licence expiry/full surrender, for the period 9/5/2005 to 20/6/2019.
The Robin Rise exploration licence, centred approximately 35 km south-southwest of Coober Pedy, covers portions of the Palaeoproterozoic basement domain known as the Coober Pedy Ridge, an east-northeast trending magnetic block of variable magnetic...-
Document
Published: 30 Jul 1919
-
Green Patch. Annual reports for the period 3/12/2001 to 30/5/2006, plus the last six years of tenure' combined annual reports/final report ('no work' letter only) to licence expiry/full surrender, for the period 1/2/2015 to 31/8/2021.
An area centred on the hamlet of Green Patch, located ~10 km north-west of Port Lincoln, was taken up to appraise the iron ore potential of known near surface BIF magnetite mineralisation occurring at the Greenpatch (sic) prospect that had been...-
Document
Published: 16 Oct 1921
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Neales River (part of the Oodnadatta Project). Annual reports and final report to licence expiry/full surrender, for the period 26/4/2002 to 11/7/2010.
The subject licence, located immediately south of Oodnadatta, was selected as an area with the potential to host economic iron oxide - associated copper-gold (IOCG) mineralisation similar to that discovered at Olympic Dam and Prominent Hill....-
Document
Published: 30 Jul 1910
-
Data release [made at SA Director of Mines’ discretion] : Ooldea. Progress and technical reports to licence expiry/renewal, for the period 6/12/1989 to 5/1/2000.
An occurrence of primary magnetite mineralisation within buried Archaean magnetic basement, first inferred from a strong northeast-trending linear magnetic anomaly observed at a location 20 km south of Ooldea Siding at the northern edge of the...-
Document
Published: 16 Nov 1999
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-33 - Mount Hope district, south-western Eyre Peninsula, Archaean iron ore mineral prospects. Drilling project final report.
The south-western Eyre Peninsula regional iron ore targeting project has recently been initiated due to the success of Lynch Mining’s previous, in part PACE Initiative - subsidised, exploratory drilling programmes (DPY2-38, January-March 2006 and...-
Document
Published: 11 Nov 1911
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document