Data release - as updated [made at SA Director of Mines' discretion] : Fowlers Bay (part of the Western Gawler JV Project). Annual report for the period 9/3/2015 to 8/3/2018.
During the 2015-2016 licence year, the Western Gawler JV Project exploration operator Western Areas Limited (WSA) conducted the first part of a regional reconnaissance bedrock drilling campaign targeting aeromagnetic anomalies which were interpreted...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Ceduna. Licence-specific annual reports submitted until the commencement of project joint reporting, for the period 28/11/2001 to 18/4/2008.
EL 2870 Ceduna covers 1390 square km located adjacent to the coast near Ceduna on north-western Eyre Peninsula. Minotaur believed that the area, which lies relatively close to the continental Fowler Suture Zone, was prospective for Proterozoic...-
Document
Published: 12 Jun 1908
-
Poochera. Partial surrender report for the period 8/1/1996 to 7/1/1999.
An aeromagnetic survey was followed by soil and calcrete sampling in the Poochera - Wirulla area, over possible southerly extensions to the Yarlbrinda Shear Zone. Only slightly elevated Au and Cu values were returned, and follow-up sampling in one...-
Document
-
Kalanbi. Progress reports to licence full surrender, for the period 2/12/1985 to 19/8/1986.
The mineralisation potential for platinum group elements within several concealed mafic and ultramafic intrusions was the target within an area taken out north of Ceduna. Limited resampling of stored bottomhole cores from 7 prior CRAE aircore...-
Document
Published: 09 Jul 1986