-
Data release - as updated : Lock. Annual reports plus final report to licence's full surrender, for the period 16/12/2008 to 13/4/2017.
No field work was done during all of licence Years 6 to 13, until the tenement was eventually surrendered. An office -based assessment was performed on ground geophysical data collected during the earliest years of tenure, allowing some new targets to...-
Document
Published: 28 Mar 1917
-
Data release - as updated : Brooker (part of the Brimpton Lake Project). Annual reports to licence expiry/full surrender, for the period 12/6/2003 to 24/8/2018.
Exploration Licence 3096 “Brooker” covering an area of 682 square km lies east of Elliston on the Eyre Peninsula in South Australia. It is one of three adjacent tenements that form the “Brimpton Lake Project”; the other two are EL 2662 (initially...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-52, Oakdale Project area Archaean VHMS mineral prospects. Project final report.
Five rotary precollared, NQ2 diamond drillholes were completed as a PACE Year 4 subsidised drilling project (DPY4-52) between January 2007 and June 2007, during a regional diamond drilling programme on the licensee's ELs (involving overall ~ 6000 m of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-24, Greenly Project nickel and base metals mineral prospects. Project final report.
A high-resolution 100 m line spaced aeromagnetic/radiometric survey conducted in October 2006 by UTS Geophysics for InterMet Resources over its EL 3314, located immediately north of Coffin Bay, revealed prominent N-S trending linear magnetic features...-
Document