-
Katnook 2. Test reports.
Numerous analyses of Katnook 2 drilling results, well logs, open and cased- hole drillstem tests and extended production testing are discussed by various specialist reservoir engineering reports. Current conclusions are that testing so far of the...-
Document
-
Gidgealpa 6. Test reports.
There is no abstract created for this record-
Document
-
Murray Basin mineral sands infrastructure planning study.
The final report of the Murray Basin Mineral Sands Infrastructure Planning Study was presented to Senator Nick Minchin and the three State Ministers responsible for Mines and Energy Resources on 3 August at Mildura. The study, by consultants Sinclair...-
Document