-
Amdel Project : feasibility study into production of magnesia from [Neales River] dolomite (Stage 1). Progress report no. 1 for the period 19/3/1970 to 15/5/1970.
Composite channel samples of outcropping dolomite rock, taken from the banks of the lower Neales River, were subjected to laboratory tests to find out which physical property of the raw material best relates to its actual MgO content. The aim is to...-
Document
Published: 25 May 1970