-
White Hill. Annual reports to licence expiry/full surrender, for the period 28/11/2014 to 27/11/2016.
A licence area consisting of two sub-blocks that are respectively situated to the west and the south-west of White Hill, within the Christie Domain close to the western margin of the Mount Woods Inlier and ~40 km distant from Prominent Hill, was taken...-
Document
Published: 12 Dec 1916
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 1917
-
Ingomar Station and Phar Lap Outstation (part of Ingomar JV Project). Joint annual plus separate annual and final reports to licences' expiry/full surrender, for the period 13/6/2002 to 23/7/2007.
Work done on two licences covering inferred Challenger - type vein gold or Olympic Dam / Prominent Hill style IOCG mineralisation - prospective ground that is situated approximately 70 km to the south and south-east of Coober Pedy has been confined to...-
Document
Published: 22 Aug 1907