-
Data release made in lieu of submitting a first partial relinquishment report for EL 1319 : Mount Gunson (plus precursor parts of Charlinga and Pandurra). Licence-specific progress reports and technical reports for the period 25/10/1979 to 13/2/1987.
TARGET: Cattlegrid type copper deposits and Olympic Dam type copper-gold-uranium mineralisation. EXPLORATION: Ground magnetic, IP, gravity, SIROTEM, CSAMT, and seismic reflection surveys, photogeological and lithogeochemical studies, reprocessing of...-
Document
Published: 01 Jan 1987
-
Mount Messenger. Progress reports and final report to licence expiry/full surrender, for the period 14/11/1975 to 13/11/1976.
Ongoing base metal exploration in the Cleve district of eastern Eyre Peninsula has comprised detailed regional mapping, extensive geochemical and petrological sampling, and percussion drilling of selected geochemical anomalies. Assay results indicate...-
Document
Published: 20 Dec 1976