-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Wanilla (originally part of the Wanilla JV Project). Annual reports submitted until the commencement of licences' joint reporting for the Gum Flat Iron Ore Project, for the period 13/2/2007 to 12/2/2010.
A large north-south orientated area centred ~45 km north-west of Port Lincoln was taken up to explore for possible buried Archaean komatiite-hosted nickel, volcanic hosted massive sulphides (base metals), orogenic lode gold, BIF-hosted iron ores and...-
Document
Published: 01 Jun 1910
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document
-
Mount Messenger. Second partial surrender report, for the period 25/5/1973 to 13/2/1976.
1069 square km or ~79.5% of the originally granted area of EL 218 have been relinquished to comply with the licence conditions previously agreed to with SADM for renewing of tenure at the expiry of the company's former EL 67. Work undertaken on the...-
Document