-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
Peltabinna Hill. Annual reports, plus final report to licence expiry/full surrender, for the period 2/5/2013 to 1/5/2017.
An area located along the south-south-western margin of the Gawler Ranges volcanic province has been explored for possible economic buried copper-gold and/or base metal mineralisation which might have been emplaced during the early stages of the...-
Document
Published: 29 May 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 1919
-
Eureka Bluff. Annual reports and combined 4th-5th annual/final report to licence expiry/full surrender, for the period 29/11/2005 to 28/11/2010.
An area located 50 km north-northeast of Wudinna, and situated on the southern margin of the Gawler Ranges, has been explored for possible economic deposits of both Olympic Dam style epithermal copper-gold-uranium and Tanami style orogenic lode gold,...-
Document
Published: 28 Feb 1911
-
Tanner Dam North. Final report at licence full surrender, for the period 22/11/2012 to 26/2/2014.
An area centred approximately 130 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document
-
Tanner [Dam]. First annual report plus final report to licence expiry/full surrender, for the period 21/12/2011 to 20/12/2013.
An area centred approximately 120 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document
-
RB 18/00207 Report on the Moonaree Station saline groundwaters and the possible origin of the saline material. Grid G.6.
Moonaree Station property covers an area of nearly 1000 square miles. It is situated in a strip of country between Lakes Acraman, Everard and Gairdner on the northern edge of the Gawler Ranges about 120 miles northwest of Iron Knob. Water for stock is...-
Document
Published: 01 Jan 1941
-
PACE Copper Gawler Craton Airborne Survey, Region 6, data package.
During fine weather intervals within the period 31 July 2018 to 23 January 2019, the southern half of the GAIRDNER 1:250k map sheet area and the northern half of the YARDEA 1:250k map sheet area were flown under contract to the SA Government and...-
Dataset
- PDF,
- ZIP
-
PACE Copper Gawler Craton Airborne Survey, Region 5, data package.
During fine weather intervals within the period 21 June to 30 September 2018, the southern half of the CHILDARA 1:250k map sheet area and the onshore two-thirds of the STREAKY BAY 1:250k map sheet area were flown under contract to the SA Government...-
Dataset
- PDF,
- ZIP