-
False Bay (South). Progress report for the period 23/7/1970 to 22/7/1971.
No text - one plan only, depicting the location and engineering surveyor's details for a planned earth fill embankment, to be constructed within SML 449 on the seaward side of the proposed primary evaporation pond for a 360,000 tons per annum saltworks.-
Document
Published: 23 Jun 1970
-
Point Paterson. Annual and final reports to licence expiry/full surrender for the period 2/6/2003 to 1/6/2006.
Evaluation of the feasibility of re-establishing salt production facilities at the abandoned solar salt works on the tidal flats at Point Paterson, 15 km south-east of Port Augusta, has been undertaken by the current local SA major salt producer...-
Document
-
Redcliff. Progress reports to licence surrender, for the period 12/1/1976 to 21/10/1977.
Reports provide a history of the assistance given by the licensee and State Government officials to Dow Chemical Co. to enable their re-assessment of the viability of the proposed Redcliff Petrochemical Plant and associated raw material sources.-
Document
-
False Bay. Progress reports to licence expiry/renewal, for the period 1/7/1969 to 30/6/1971.
Site investigations of the coastal area abutting False Bay, immediately north of Whyalla, were undertaken by BHP's Industrial Minerals Div. to gauge the feasibility of expanding their Whyalla Salt Works from its existing 60,000 tons per annum...-
Document
Published: 07 May 1970