-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 1919
-
The Murray Basin Project. Joint progress reports and joint final report to remnant licences' full surrender, for the period 7/10/1980 to 6/12/1984.
Thirteen contiguous exploration licences located along the western margin of the Tertiary Murray Basin were taken up by CRA to search for economic buried brown coal / lignite deposits of the type already known from small discoveries that had been made...-
Document
Published: 07 Mar 1985
-
Data release [made at SA Director of Mines’ discretion] : Kottata Well, Eldale, Tootla and Broadacres (also part of the Yaninee Project). First annual report for EL 3135, plus subsequent joint annual reports, for the period 29/9/2003 to 5/6/2009.
An area located on central western Eyre Peninsula between Minnipa and Port Kenny was taken up to explore the Precambrian basement rocks, which are poorly exposed there, for possible economic buried iron oxide - associated copper-gold (IOCG) deposits....-
Document
-
RB 2012/00008 Abminga bedrock drilling program 2001.
The Abminga bedrock drilling program was initiated in 1999 as part of the Targeted Exploration Initiative of South Australia (TEISA) strategy conceived by the SA Government and implemented through PIRSA's Mineral Resources Group. Drilling was proposed...-
Document
Published: 01 May 2012
-
Heartbreak Bore (part of Afmeco's Tarcoola Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 15/1/1982.
Portions of regional airborne radiometric and magnetic surveys, plus a small part of the HW-IV seismic refraction traverse, and 20 line km of gravity and ground magnetic surveys, were undertaken by joint venture operator Afmeco as part of its Project...-
Document
-
Mount Treloar (NW of Oodnadatta). Progress and final reports for the period 30/6/80 to 29/12/80.
Follow-up investigations of possible buried channel redox front uranium mineralization on the edge of the Eromanga Basin, in the vicinity of the SA-NT border, included a geophysical and structural interpretation of available data, the drilling and...-
Document
Published: 23 Feb 1981
-
Venus Bay. Third partial surrender report, for the period 27/7/1994 to 26/1/1998.
Diamond and gold exploration undertaken on the two relinquished ground portions located north-west and east of Venus Bay on Eyre Peninsula, which total 530 square km in area, have comprised heavy mineral sampling, heavy mineral grain microprobing,...-
Document
-
Anna. Progress reports to licence expiry/full surrender, for the period 23/2/1977 to 22/2/1978.
Contains a SADME-written report on the November 1976 SA Government appraisal drilling of the Anna Coalfield (2 rotary mud/partly cored holes, total penetration 159.62 m, including 28.36 m of coring) to determine coal quality and verify thickness of...-
Document