-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial surrender: Southern Gold gold exploration JV - specific annual reports 6/2/2006 to 30/6/2009. [Index Part 2 of 2].
After the Southern Gold joint venture agreement was signed in February 2006, that company as JV operator performed a due diligence review of Dominion Mining's exploration data, did some orientation soil calcrete and biogeochemical sampling at Typhoon...-
Document
Published: 02 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-46, Coober Pedy Ridge southern margin (Robin Rise Project) IOCG mineral prospects. Project final report.
The approved PACE Initiative Theme 2 drilling proposal DPY3-46 was specifically designed to test for haematite-dominant iron oxide - associated copper-gold (IOCG) mineralisation in an area of the northern Gawler Craton where little past exploration...-
Document
Published: 07 May 1907
-
Partridge Range (part of the Gibraltar Joint Venture Project). Annual reports and final report to licence full surrender, for the period 4/3/1997 to 3/12/2008.
Exploration of an area with poor basement outcrop, located approximately 45 km north-east of Tarcoola, primarily sought possible fault or breccia-hosted mesothermal gold +/- base metal mineralisation in likely multiphase Mesoproterozoic felsic...-
Document
Published: 12 Aug 1908
-
Sandstone Outstation. Annual reports to licence expiry/full surrender, for the period 22/11/1996 to 17/1/2006.
A collection of eight land parcels recently relinquished from the Resolute Resources / Dominion Mining JV EL 2018, and covering 215 square km in an area located approximately 110 km south-west of Coober Pedy, was taken up by a new consortium intending...-
Document
Published: 28 Feb 1906
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
Bulgunnia Station (part of the Titan Base-Precious Metals Project). First annual report, plus final report to licence full surrender, for the period 10/4/2015 to 18/10/2016.
An area centred ~120 km south-west of Coober Pedy has been explored for possible economic buried gold and base metals mineralisation that may have formed within Proterozoic and older basement rocks. Mostly these are covered by the younger Jurassic...-
Document
Published: 15 Nov 1916
-
Coober Pedy Project. Annual reports, joint annual reports, and final reports at individual licences' full surrender, for the period 4/4/2011 to 3/4/2015.
Five separate areas located in the northern Gawler Craton adjacent to the Mount Woods Domain, which to date have received only minor attention from mineral explorers and so have had limited drilling done, have been explored for possible buried...-
Document
Published: 15 Apr 1915
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
Data release - as updated : Tallaringa North and Tallaringa South (part of the Coober Pedy Project). Joint annual reports to licences' joint expiry/full surrender, for the period 24/5/2012 to 23/5/2019.
Three areas centred ~120 km west south-west of Coober Pedy and lying in the northern part of the Gawler Craton, one located within the Mabel Creek Domain and the other two being adjacent and further to the south, within the Christie Domain next to a...-
Document
Published: 19 Jun 1919
-
Whymlet (part of the Mintabyng Project). Data release - as updated - made in lieu of submitting a second partial surrender report : annual reports for the period 29/11/2012 to 28/11/2020.
In late November 2012, three adjoining areas in the central Gawler Craton were taken up by Woomera Exploration Limited (WEX), an unlisted public company, for the purpose of minerals exploration. Within the subject licence area which is centred ~22 km...-
Document
Published: 27 Jul 1921
-
Data release - as updated : Muckanippie Outstation. Annual reports to licence expiry/full surrender, for the period 14/1/2013 to 13/1/2020.
An area centred ~70 km north-west of Tarcoola is being explored for possible buried economic iron ore (particularly haematite DSO) and for buried copper-gold or copper-nickel-chromium massive sulphide mineralisation that may have formed within...-
Document
Published: 17 Feb 1920
-
Muckanippie. Fourth partial surrender report submitted at licence expiry/renewal, for the period 20/10/2005 to 23/2/2016.
EL 3438 Muckanippie is located in the northern Gawler Craton, on the western margin of the Gawler Range Volcanics Domain, and is centred approximately 60 km north-west of Tarcoola. The principal target within EL 3438 is possible economic occurrences...-
Document
Published: 30 Jan 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915
-
Commonwealth Hill Station - Central (part of the Commonwealth Hill Project). Second partial surrender report, for the period 11/5/2007 to 10/5/2017.
Six separate portions of the subject licence, with a combined total area of 35 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium, PGEs and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : North-west Olympic Domain Project. Joint annual reports plus annual reports for the period 8/10/2013 to 7/10/2018. Plus partial/expiry/full surrender reports to 24/04/2024.
Ten licences distributed across a broad region of the north-eastern Gawler Craton, between Roxby Downs and Coober Pedy, are being explored for possible buried economic IOCG style mineralisation. Research and interpretation completed by the licensee...-
Document
Published: 20 Nov 1918