-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
The Northern Gawler Project. Data release made in lieu of submitting partial surrender reports for ELs 5566 and 5567 upon renewal of those licences : joint annual reports for the period 1/2/2015 to 31/1/2020.
Portions of two tenements located to the south and south-east of Coober Pedy were relinquished at the start of 2020, and all mineral exploration data previously acquired by licensee Southern Iron on these tenements and on four others that now comprise...-
Document
Published: 28 May 1920
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual report for the period 24/3/1995 to 8/8/2018.
During the twenty-first licence year, now under tenure as EL 5719 covering the same area as former EL 4534, no new work was done. During the twenty-second licence year SA Coal commenced field work on their IOCG style mineralisation exploration...-
Document
Published: 29 Aug 1918
-
The Twins (part of the Stuart Range Joint Venture Project). Progress reports and final report to licence full surrender, for the period 30/3/1977 to 31/7/1978.
Following the first public announcement on 18/11/1976 by Western Mining Corp. of its giant Olympic Dam copper, gold and uranium discovery on Roxby Downs Station, Newmont Pty Ltd began a detailed assessment of the Stuart Shelf region of South...-
Document
-
Data release - as updated : Robin Rise. Annual reports plus final report to licence expiry/full surrender, for the period 9/5/2005 to 20/6/2019.
The Robin Rise exploration licence, centred approximately 35 km south-southwest of Coober Pedy, covers portions of the Palaeoproterozoic basement domain known as the Coober Pedy Ridge, an east-northeast trending magnetic block of variable magnetic...-
Document
Published: 30 Jul 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports and technical reports to licence expiry/renewal, for the period 24/3/1995 to 23/3/2000.
On 27/3/1995, following a competitive bidding process, South Australian Coal Corp., a wholly owned subsidiary of Meekatharra Minerals Limited, was granted EL 2069 covering the Phillipson Coalfield located ~60 km south-west of Coober Pedy. The...-
Document
Published: 07 Jul 1998
-
Millers Creek (part of the Billa Kalina Project). Joint annual reports, plus final report to licence's full surrender, for the period 30/8/2012 to 14/7/2016.
During licence Year 7, a small ground gravity survey was acquired at Peeweena Dam on the western side of EL 4854, to try to validate a significant 10 mGal anomaly first identified by a previous widely spaced (7 km x 7 km) BMR regional gravity survey...-
Document
Published: 20 May 2016
-
Carnding. Annual reports and final report to licence full surrender, for the period 18/1/2006 to 22/2/2012.
Three separate small sub-blocks forming a licence in the Tarcoola district have been explored for possible economic buried Tertiary sandstone-hosted uranium mineralisation and for any other metallic mineralisation that may have formed in underlying...-
Document
Published: 29 Feb 2012
-
Robin Rise. Annual reports to licence expiry/full surrender, for the period 2/1/1997 to 2/6/2004.
The subject EL 2249 and follow-on EL 2966 consisted of two areas: Area 'A', centred 40 km SSW of Coober Pedy, covering a Permian coal basin, the Penrhyn Trough; and Area 'B', centred 70 km SSE of Coober Pedy. Interpretation of regional gravity and...-
Document
Published: 10 Jun 2004
-
Billa Kalina, Welcome Creek, Millers Creek, Margaret Creek and Francis Swamp (the Billa Kalina G2 Diamond Project). Data release made at remaining licences' joint partial surrender: joint annual reports for the period 25/2/2006 to 29/8/2012.
As part of continuing diamond exploration on the subject five licences, more of the first pass sampling program was completed by Flinders Diamonds in August 2006 via aircore drilling of 47 vertical holes for an aggregate 1852 m aimed at penetrating to...-
Document
Published: 10 May 2012
-
Tallaringa and Jindivic Bore. Joint annual reports to licences' combined expiry/full surrender, for the period 30/7/2007 to 12/8/2013.
A search for possible economic buried IOCG mineralisation which might exist within a widespread region of sparsely explored ?Archaean to Mesoproterozoic high grade metamorphic basement terrain, which underlies three licence sub-areas located 100-180...-
Document
Published: 30 Aug 2013
-
Galaxy Tank (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 22/3/2006 to 10/5/2013.
Tasman Resources' ("Tasman") Central Gawler Project tenement acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds: however, following Tasman's...-
Document
Published: 16 Jul 2013
-
Data release - as updated : Phar Lap Outstation. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
An area centred ~85 km south-southeast of Coober Pedy, at the southern margin of the Lake Phillipson Trough, a long active tectonic feature now occupied by deep sedimentary fill, was taken up by a wholly-owned subsidiary to Monax Mining Ltd primarily...-
Document
Published: 24 May 2017