-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Mount Harcus. Annual reports for period 27/6/2005 to 26/6/2010.
Mt Harcus EL3368 is located within the Palaeoproterozoic Musgrave Province. The region is recognised by PepinNini Minerals Ltd as prospective for magmatic Ni-Cu Sulphide mineralisation, platinum group metals, base metals, diamonds, and precious...-
Document
-
Data release - as updated : Mount Irwin (part of the Alcurra Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2021.
An area in the eastern Mugrave Ranges centred ~75 km south-east of Kulgera is being explored for possible buried economic magmatic Ni-Cu-PGE mineralisation hosted by inferred Proterozoic Giles Complex layered ultramafic intrusions, and also for...-
Document
Published: 22 Jul 1921
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Granite Downs. Progress and final reports for the period 28/8/1969 to 22/10/1970.
Field reconnaissance and assessment of surface mineralisation, regional geological mapping and geochemical sampling, detailed ground magnetic and radiometric surveying, and shallow vertical percussion drilling (5 holes, total 491 feet) were carried...-
Document
Published: 22 Sep 1970
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-30 - Hanging Knoll portion of Woodroffe Project area - Proterozoic basement-hosted base and precious metal mineral prospects. Drilling project final report.
Targeted stratigraphic and mineral exploratory drilling recently carried out by PepinNini Minerals within its EL 3931 Hanging Knoll was done as part of the sixth round of Theme 2 of the PACE Initiative (Primary Industries and Resources South...-
Document
Published: 15 Feb 1911
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Data release [made at SA Director of Mines' discretion] : Mount Hardy (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the eastern end of the Deering Hills in South Australia's Far North-west Aboriginal Lands, approximately 150 km south-west of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as part of...-
Document
Published: 12 Apr 1907
-
Mount Howe. First partial surrender report, for the period 26/9/1994 to 15/4/1997.
Exploration over the eastern flank of the Musgrave Block to the north of De Rose Hill, for potential buried Giles Complex layered intrusive bodies, comprised SAEI data interpretation, airborne magnetic, radiometric and electromagnetic surveys, ground...-
Document
-
Mount Howe. Annual and final reports for the period 26/9/1994 to 25/9/1998.
An aeromagnetic/radiometric survey and an aircore drilling program (41 holes, total 247 metres) were carried out near the SA/NT border to the north, north-east and west of De Rose Hill, to test three positive aeromagnetic features which potentially...-
Document