-
Mount Gee. Progress and final reports for the period 6/1/87 to 5/1/90.
TARGET: Rare earth elements and epithermal gold mineralization in the Mount Painter Inlier. EXPLORATION: Regional bulk cyanide leach (BCL) stream sampling, and rock chip sampling; logging and sampling of stored cores from three previous diamond drill...-
Document
Published: 01 Jan 1990
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Lake Labyrinth. Fourth partial surrender report, for the period 31/10/2001 to 8/2/2011.
Exploration for possible buried epithermal or hydrothermal gold deposits within the large variety of Archaean, Palaeoproterozoic and Mesoproterozoic basement rocks present in an area located 20 km east of Tarcoola has targeted the potential of a...-
Document
Published: 27 Jun 1911
-
RB 79/00119 Relogging of diamond drillhole MM14, Mutooroo mines (with appendix of petrographic report by Pontifex and Associates Pty Ltd on Diamond Drill Holes MM15 and MM21A).
The deepest yet completed, diamond-cored base metal exploration hole in South Australia (DDH MM14 : total depth 5312 feet = 1619.1 m) was drilled on a moderately dipping trajectory at the historic Mutooroo mines, as part of copper exploration being...-
Document
Published: 16 Jul 1979