RB 88/00014 Petroleum exploration and development in South Australia (5th edition).
In South Australia since 1958, 140,400 km of seismic have been recorded (75,500 onshore) and 882 wells drilled (of which 16 are offshore wildcats and 238 are development wells). Exploration and development have taken place in three distinct phases....-
Document
Published: 01 Mar 1988
-
RB 89/00083 Preliminary Explanatory Notes for the BARTON 1:250 000 sheet.
There is no abstract created for this record-
Document
Published: 01 Apr 1993
-
RB 90/00014 Explanatory Notes for the TALLARINGA 1:250 000 geological map.
There is no abstract created for this record-
Document
Published: 01 Mar 1991
-
RB 93/00053 South Australian resources. Technical sessions. Abstracts.
Abstracts include: Conference presentation summary for the 1993 MESA BARTON and Colona drilling programmes (both forming part of the South Australian Exploration Initiative) - [technical rationale, planned drillholes and preliminary results]....-
Document
Published: 03 Dec 1993
-
RB 89/00018 Petroleum exploration and development in South Australia (6th edition).
There is no abstract created for this record-
Document
Published: 01 Apr 1989
-
RB 96/00034 1996 MESA petroleum industry survey.
A consultant to MESA interviewed approximately 30 petroleum industry personnel throughout Australia from April to July, 1996. The aims of the customer feedback poll were to measure the Petroleum Division's performance in promoting and regulating the...-
Document
Published: 01 Oct 1996
-
EPP 5, Eucla, Duntroon and Bight Basins (Ceduna Terrace). Progress and technical reports for the period 20/9/68 to 13/1/76.
The programme of work pursued over EPP 5 was as follows: Permit Year 1 - interpretation of 407 line km of regional reconnaissance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
Published: 13 Jan 1976
-
EPP 16 permit Year 2. Quarterly and annual reports for the period 30/6/81 to 29/6/82.
Reports deal mainly with ongoing seismic processing and interpretation projects. A number of prospects were identified during Year 1 from the reprocessing of older Shell seismic data, and followed up in Year 2 by the acquisition of a 1205 line km...-
Document
-
PEL 4, Eucla, Denman and Bight Basins. Progress and technical reports for the period 13/9/68 to 18/4/74.
PEL 4 was granted to Outback Oil Co. NL on 14/11/68 to succeed the onshore part of the former OEL 33 in the Eucla Basin region, and allow continuity of exploration in a little known petroleum province. Early in licence Year One Outback Oil succeeded...-
Document
Published: 08 Apr 1974
-
EPP 11, Eucla and Bight Basins. Progress and technical reports for the period 8/11/68 to 26/4/77.
EPP 11 was taken up by Shell in mid-1968 as high risk, potentially high reward frontier acreage over very deep water (200 to 2000 metres) in the Great Australian Bight outer continental shelf / continental slope region of South Australia. At that...-
Document
Published: 26 Apr 1977
-
Final report, South Australia offshore permits SA.10 and SA.11.
The R 10 Marine Seismic Survey was conducted during March, 1976 within EPPs 10 and 11 to detail the previously indicated Galah, Kookaburra and Rosella-Jabiru leads. This survey defined three structurally sound closures, Galah, Kookaburra East and...-
Document
-
Evaluation report on South Australian deep water acreage (SA-10 and SA-11).
From the interpretation of the 1971 R 6 seismic survey data plus earlier geophysical work in the central Bight Basin region, present indications are that a 10,000-26,000 feet thick sedimentary sequence occurs in the area covered by Shell's SA-10 and...-
Document
-
Great Australian Bight Basin, offshore South Australia.
EPPs 10 and 11 currently comprise 239 graticular blocks (approximately 17 000 sq km) in the Great Australian Bight Basin. No wells have yet been drilled in these permits which lie entirely in water depths greater than 200 m and ranging down to 1 500...-
Document
-
EPP 5. 1973 evaluation report.
Following an unsuccessful attempt at farming out part of EPP 5 in late 1972, Shell resolved to continue exploring that permit area in its own right, subject to the offshore Designated Authority's approval of a variation in permit conditions, which was...-
Document
-
Mallabie 1. Test reports.
There is no abstract created for this record-
Document
Published: 30 Aug 1982
-
1976 marine seismic survey, R 10, operations, interpretation and final reports. Eucla and Bight Basins and Ceduna Terrace EPP 10 and EPP 11.
Three structural closures have been defined by the R 10 survey. These are Galah in Permit SA-11 and Kookaburra West and Kookaburra East in Permit SA-10. Economic evaluation of the structures is currently being undertaken, but it is considered in the...-
Document
-
Geological and geophysical study in offshore Eucla Basins, Western Australia.
There is no abstract created for this record-
Document
-
EPP 5, Bight and Eucla Basins. Farmout proposal, November 1972.
This farmout proposal is directed at the Australian and overseas petroleum exploration industry, with the aim of sharing 50/50 the upcoming A$3 million risk inherent in the EPP 5 permit Years 4/5 one well drilling commitment. Shell invited 26 likely...-
Document
-
EPP 10, Eucla and Bight Basins. Progress and technical reports for the period 8/11/68 to 26/4/77.
EPP 10 was taken up by Shell in mid-1968 as high risk, potentially high reward frontier acreage over very deep water (200 to 2000 metres) in the Great Australian Bight outer continental shelf / continental slope region of South Australia. At that...-
Document
Published: 26 Apr 1977
-
Flinders Deepwater 2D Marine Seismic and Gravity Survey.
The Flinders Deepwater 2D Seismic, Gravity and Magnetic Survey was recorded over EPP 28,29 and 30 located in the Great Australian Bight during Dec 2000 until May 2001. The survey contained 117 2D lines with a total line length of 15636km of seismic...-
Document