-
RB 41/00083 Iron ore deposit near Gladstone, secn 182 Hd Yangya.
There is no abstract created for this record-
Document
Published: 01 Jan 1955
-
RB 55/00049 Ironstone deposits, Radium Hill district.
Reconnaissance of ironstone quarries and iron formation outcrops revealed Archaean (?) and Upper Proterozoic (Sturtian) iron formation and laterites derived from them. These are easily distinguished on geological and aeromagnetic criteria. While a...-
Document
Published: 01 Jan 1964
-
RB 44/00032 Report on prospect no. 1, South Iron Queen, south area Middleback Range and north district.
A small area of coarse haematite floaters were tested by scout boring to determine the origin of the haematite. The boring proved the material to be a scree deposit probably from an eroded ore body further up the slope to the north of Prospect No. 2.-
Document
Published: 01 Jan 1957
-
RB 96/00024 Gawler Ranges drilling report 1994.
The Mesoproterozoic Gawler Range Volcanics - Hiltaba Granite Suite - related Olympic Dam style Cu-U-Au mineralisation, and Menninnie Dam replacement style Pb-Zn-Ag mineralisation, have served to raise the prospectivity of rocks in and underlying the...-
Document
Published: 12 Sep 1996
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2005 to 6/11/2010. [ Index Part 2 of 2 ].
During the first year of renewed tenure under EL 3445, the work done consisted of performing diamond and RC drilling programmes which were partly funded by PIRSA's PACE Initiative as Theme 2, Year 2 and 3 approved Drilling Collaboration Projects. The...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
South Puttapa. Progress and final summary reports for the period 15/7/1970 to 16/7/1971.
Appraisal of the Beltana zinc deposit continued during the current licence period, principally by diamond drilling (6 holes, total 2570 feet) aimed at delineating blind extensions to the main orebody on its southern side. The drilling was very...-
Document
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 1923
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Cronje Dam and Oak Bank Outstation (the Cronje Dam Sedimentary Uranium Project). Annual and joint annual reports, plus final report at remaining licence's expiry/full surrender, for the period 20/10/2005 to 1/11/2014.
An area comprised of three separate sub-blocks generally located ~60 km south of Manna Hill and ~70 km south-southeast of Olary has been explored for Tertiary sedimentary uranium which may have formed in buried north to south trending palaeochannels...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Comet Outstation, Gina Outstation, Commonwealth Hill Station - Central and East, and Aurora Tank areas (the Commonwealth Hill Project). Joint annual reports for the period 15/12/2008 to 30/6/2013.
A group of contiguous exploration licences centred ~100 km south-west of Coober Pedy are being explored principally for epithermal and Challenger-style gold mineralisation hosted by covered Archaean basement rocks, as well as for any economic base...-
Document
Published: 31 Aug 1913
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Wirrealpa. Progress and technical reports to licence expiry/full surrender for the period 13/9/1988 to 12/9/1989.
Possible economic stratabound or epigenetic lead-zinc or copper deposits, formed in altered carbonate rocks lying marginal to the Wirrealpa Diapir, were the targets of new exploration centred on the area of the old Wirrealpa lead-silver mine....-
Document
Published: 06 Nov 1989
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 1917