-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-21 - Eyre Peninsula Project, Central Gawler Gold Province, Baggy Green North prospect biogeochemical anomaly. Drilling project final report.
Early in 2016, Adelaide Resources submitted a proposal to DSD for a grant of PACE Initiative Year 9 collaborative drilling project subsidy funds to help it drill ~80 exploratory aircore or RC holes for a total of approximately 8000 m to further...-
Document
-
Harris Bluff. Annual reports plus final report to licence expiry/full surrender, for the period 21/6/2006 to 18/10/2015.
An area located immediately north of Lake Gilles and centred on Harris Bluff in the Uno Range was taken up to explore for possible buried unconformity style uranium mineralisation which could have formed at the base of the Corunna Conglomerate, and...-
Document
Published: 29 Sep 1915
-
Scrubby Peak. Combined first and second annual reports to licence expiry/full surrender, for the period 11/11/2004 to 10/11/2006.
An area situated along the western margin of the Gawler Ranges was taken up by a local landowner to explore for possible economic copper-gold and platinum metal deposits. His initial aerial reconnaissance of surface geological structures was made in...-
Document