Lake Callabonna area (part of the Lake Elder Project). First partial surrender report, for the period 19/3/1998 to 18/3/2001.
Downloads
Name | Description | Download | Select |
---|---|---|---|
Lake Callabonna area (part of the Lake Elder Project). First partial surrender report, for the period 19/3/1998 to 18/3/2001. |
About this record
Record No | mesac19131 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Mineral Company Report - Mineral Exploration |
Contributor | |
Sponsor | |
Tenement | EL 2494 |
Tenement Holder | Paladin Resources Ltd;Brightstar Power Corp. Pty Ltd |
Operator | Paladin Resources Ltd |
Geological Province | |
Mine Name | |
Stratigraphy | |
Commodity | uranium |
Notes |
Geographic Locality: Lake Callabonna;Strzelecki Track;Tidna Hill;Mount Hopeless Doc No: Env 09765
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac19131 |
Citation | Hogarth, P.J. Lake Callabonna area (part of the Lake Elder Project). First partial surrender report, for the period 19/3/1998 to 18/3/2001. Mineral Company Report - Mineral Exploration https://pid.sarig.sa.gov.au/document/mesac19131 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[139,-30],[140,-30],[140,-29.5],[139,-29.5],[139,-30]]]} |
Purpose | |
Lineage |