E-Z Beltana Project feasibility study, 1972. Part 2A - Crushing and grinding.
Created: 29 Oct 2024 Revised: 07 Dec 2024

The run-of-mine ore from Beltana requires size reduction prior to introduction to any further process, whether it be a beneficiating or extractive process. Two methods of extraction are being considered: namely, leaching, which requires...

The run-of-mine ore from Beltana requires size reduction prior to introduction to any further process, whether it be a beneficiating or extractive process. Two methods of extraction are being considered: namely, leaching, which requires beneficiation of the low grade ore at Beltana, and fuming, which requires size reduction only. For both beneficiation or fuming, a maximum particle size of 1/2 inch is required, and especially for beneficiation the quantity of fines should be minimised.

More +

About this record

Record No mesac19485
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor Davy-Ashmore Pty Ltd, Consulting Engineers, Melbourne
Sponsor Electrolytic Zinc Co. of Australasia Ltd
Tenement MC 5350
Tenement Holder Electrolytic Zinc Co. of Australasia Ltd
Operator
Geological Province
    Mine Name Beltana zinc orebody
    Stratigraphy
    Commodity zinc
    Notes
    Notes: Davy-Ashmore plant construction proposal no. 418/2A.
    Geographic Locality: Tasmania;Risdon
    Doc No: Env 01748 p: 306-321

    Notes: Davy-Ashmore plant construction proposal no. 418/2A. Geographic Locality: Tasmania;Risdon Doc No: Env 01748 p: 306-321

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/mesac19485
    Citation E-Z Beltana Project feasibility study, 1972. Part 2A - Crushing and grinding. Mineral Company Report - Mineral Exploration
    https://pid.sarig.sa.gov.au/document/mesac19485

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[138,-31],[138.5,-31],[138.5,-30.5],[138,-30.5],[138,-31]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage