This study is based on the concept of treating at Port Pirie 100,000 tons/year of non-upgraded willemite ore from Beltana with a zinc assay of 36.5%. The amount of granulated slag required in the process is the result of metallurgical...

This study is based on the concept of treating at Port Pirie 100,000 tons/year of non-upgraded willemite ore from Beltana with a zinc assay of 36.5%. The amount of granulated slag required in the process is the result of metallurgical considerations and was established as 60% ore/40% slag. The site chosen for this fuming plant was as near as practicable to the existing fuming plant at Port Pirie. This allows some interconnection of services and operations, but essentially confines this type of operation to one area of the BHAS works. The basic case, described in detail in this study, incorporates a number of important changes in process design when compared with the original fuming plant at Port Pirie. These changes are not only due to the differing feed material and product, but also due to experience gained by BHAS in their operation, and anticipated legislation concerning plant effluents. As well as presenting the design and cost estimate for the basic case, a number of variations to the process route have been investigated. These alternative routes show significant differences in capital and operating costs, which could have a large effect on their economic viability.

More +

About this record

Record No mesac19486
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor Davy-Ashmore Pty Ltd, Consulting Engineers, Melbourne
Sponsor Electrolytic Zinc Co. of Australasia Ltd
Tenement MC 5350
Tenement Holder Electrolytic Zinc Co. of Australasia Ltd
Operator
Geological Province
    Mine Name Beltana zinc orebody
    Stratigraphy
    Commodity zinc
    Notes
    Notes: Davy-Ashmore plant construction proposal no. 418/3.
    Geographic Locality: Port Pirie
    Doc No: Env 01748 p: 379-484

    Notes: Davy-Ashmore plant construction proposal no. 418/3. Geographic Locality: Port Pirie Doc No: Env 01748 p: 379-484

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/mesac19486
    Citation E-Z Beltana Project feasibility study, 1972. Part 4 - Fuming. Mineral Company Report - Mineral Exploration
    https://pid.sarig.sa.gov.au/document/mesac19486

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[138,-31],[138.5,-31],[138.5,-30.5],[138,-30.5],[138,-31]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage