Buffalo Dam (part of the Equinox JV Nuckulla Hill Project). Annual reports and progress reports to licence full surrender, for the period 23/5/1996 to 11/2/2001.
Downloads
Name | Description | Download | Select |
---|---|---|---|
Buffalo Dam (part of the Equinox JV Nuckulla Hill Project). Annual reports and progress reports to licence full surrender, for the period 23/5/1996 to 11/2/2001. |
About this record
Record No | mesac19585 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Mineral Company Report - Mineral Exploration |
Contributor | |
Sponsor | |
Tenement | EL 2168 |
Tenement Holder | Equinox Resources NL;Phelps Dodge Australasia Inc.;North Mining Ltd |
Operator | Equinox Resources NL;North Ltd |
Geological Province | Gawler Craton |
Mine Name | Apostle North prospect |
Stratigraphy | |
Commodity | |
Notes |
Geographic Locality: Gawler Ranges;Buffalo Dam;Lake Everard Station;Cave Paddock;Apostle Paddock;Lake Gairdner National Park Doc No: Env 09215 Drillhole: AAC001 - AAC023
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac19585 |
Citation | Parker, A.J.;Weissgerber, Y.;Cooke, J. 1901. Buffalo Dam (part of the Equinox JV Nuckulla Hill Project). Annual reports and progress reports to licence full surrender, for the period 23/5/1996 to 11/2/2001. Mineral Company Report - Mineral Exploration https://pid.sarig.sa.gov.au/document/mesac19585 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[134.5,-32],[135.5,-32],[135.5,-31.5],[134.5,-31.5],[134.5,-32]]]} |
Purpose | |
Lineage |