Eileen Bore and Cedric Bore (part of Bulgunnia copper-gold project). Annual and final surrender report for the period 10/5/2002 to 14/4/2003.
Downloads
Name | Description | Download | Select |
---|---|---|---|
Eileen Bore and Cedric Bore (part of Bulgunnia copper-gold project). Annual and final surrender report for the period 10/5/2002 to 14/4/2003. |
About this record
Record No | mesac19628 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | Mineral Company Report - Mineral Exploration |
Contributor | |
Sponsor | |
Tenement | |
Tenement Holder | Rio Tinto Exploration Pty Ltd |
Operator | |
Geological Province | Gawler Craton |
Mine Name | |
Stratigraphy | Gawler Range Volcanics |
Commodity | magnetite |
Notes |
Geographic Locality: Bulgunnia Station;Woomera Prohibited Area Doc No: Env 10026 Drillhole: CRAE Goode A1
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac19628 |
Citation | Bishop, S.R. Eileen Bore and Cedric Bore (part of Bulgunnia copper-gold project). Annual and final surrender report for the period 10/5/2002 to 14/4/2003. Mineral Company Report - Mineral Exploration https://pid.sarig.sa.gov.au/document/mesac19628 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[134.584677,-30.298545],[134.851347,-30.298545],[134.851347,-30.131875],[134.584677,-30.131875],[134.584677,-30.298545]]]} |
Purpose | |
Lineage |