Pioneer Dam. Progress and final reports for the period 17/2/1975 to 24/10/1975.
Published: 16 Sep 1975 Created: 28 Oct 2024 Revised: 18 Dec 2024

Drilling of 5 holes, plus a resistivity survey, indicate low potential for sedimentary uranium.

Drilling of 5 holes, plus a resistivity survey, indicate low potential for sedimentary uranium.

About this record

Record No mesac2146
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor
Sponsor
Tenement EL 171
Tenement Holder Mines Administration Pty Ltd;Teton Exploration Drilling Co. Ltd
Operator
Geological Province
    Mine Name
    Stratigraphy
    Commodity uranium
    Notes
    Notes: Includes:  Resistivity survey on EL 171, South Australia (Pioneer Dam Project).
    Geographic Locality: Pioneer Dam
    Doc No: Env 02531

    Notes: Includes: Resistivity survey on EL 171, South Australia (Pioneer Dam Project). Geographic Locality: Pioneer Dam Doc No: Env 02531

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/mesac2146
    Citation Ellis, G.K.;Brunt, D.A. 1975. Pioneer Dam. Progress and final reports for the period 17/2/1975 to 24/10/1975. Mineral Company Report - Mineral Exploration
    https://pid.sarig.sa.gov.au/document/mesac2146

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[140.001304,-31.398496],[140.16797,-31.398496],[140.16797,-31.265161],[140.001304,-31.265161],[140.001304,-31.398496]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage