An engineering consultancy firm was engaged by the mine's new operators to review the current situation regarding storage of ore processing mill tailings at the Mount Gunson Project site, and was asked to prepare recommendations for the continued...

An engineering consultancy firm was engaged by the mine's new operators to review the current situation regarding storage of ore processing mill tailings at the Mount Gunson Project site, and was asked to prepare recommendations for the continued development of the tailings dams to allow storage of mill wastes that will be produced over the next 9-12 months. It was proposed that the embankment crest of the existing Stage 3 (largest) tailings dam be raised by approximately 1-2 m to safely accomodate another 500,000 tonnes of tailings fill. Preferred methods of embankment construction and of subsequent tailings handling have been suggested, to confer the most efficient management plan. An estimated 16,000 cubic m of construction material will need to be placed upon the embankment crest.

More +

About this record

Record No mesac21784
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor WLPU Consultants (Australia) Pty Ltd
Sponsor Emeco (WA) Pty Ltd;MacMahon Construction Pty Ltd
Tenement
Tenement Holder
Operator
Geological Province
    Mine Name Cattlegrid copper mine
    Stratigraphy
    Commodity copper
    Notes
    Geographic Locality: Mount Gunson;Pernatty Lagoon
    Doc No: Env 05429 p: 494-511

    Geographic Locality: Mount Gunson;Pernatty Lagoon Doc No: Env 05429 p: 494-511

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/mesac21784
    Citation Cooper, D.E.H. Mount Gunson Copper Project. Tailings storage - current status and proposals for future management. Mineral Company Report - Mineral Exploration
    https://pid.sarig.sa.gov.au/document/mesac21784

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[137,-31.5],[137.5,-31.5],[137.5,-31],[137,-31],[137,-31.5]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage