Macdonald Hill, Mingary and Bulloo Creek (Drew Hill Project). First partial surrender/ second partial relinquishment reports at project licences' expiry/renewal, for the period 30/9/2003 to 29/9/2008.
Published: 13 May 1909 Created: 12 Nov 2024 Revised: 12 Nov 2024

Work carried out on the now relinquished licence portions has comprised the acquisition, processing and interpretation of Aster satellite imagery (SWIR, VNIR and Landsat TM247 images) by contractor Geoimage in November 2004, followed by a...

Work carried out on the now relinquished licence portions has comprised the acquisition, processing and interpretation of Aster satellite imagery (SWIR, VNIR and Landsat TM247 images) by contractor Geoimage in November 2004, followed by a consultant's airphoto geological interpretation commissioned in March 2005. The results of this work have been separately reported to PIRSA as Appendices 2 and 3 to the report dataset submitted in fulfilment of PACE Initiative Drilling Project DPY2-34 (ref. Hatton 2006). [This report has already been released to the public as open file Env 11,108]. Additional minor work performed in June 2006 was a VTEM survey flown over a small area in the east of the now relinquished portion of EL 3138 by contractor Geotech Services. The client Noranda Pacific did not identify any significant late-time conductors in the processed EM data.

More +

About this record

Record No mesac22051
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor Geoimage Pty Ltd;Snodin Photogeological Services;Geotech Airborne Pty Ltd
Sponsor Noranda Pacific Pty Ltd;Falconbridge (Australia) Pty Ltd
Tenement
Tenement Holder Polymetals Group Pty Ltd;Exco Resources (SA) Pty Ltd;Noranda Pacific Pty Ltd
Operator Exco Resources Ltd
Geological Province Curnamona Province
Mine Name
Stratigraphy
Commodity
Notes
Notes: ELs 3137 and 3138 have been renewed over reduced areas as ELs 4199 and 4200 respectively. 25% of EL 3257 was relinquished on 5/8/2008 (i.e. at end of licence year 4 - this EL still has one year of its term remaining).
Geographic Locality:...

Notes: ELs 3137 and 3138 have been renewed over reduced areas as ELs 4199 and 4200 respectively. 25% of EL 3257 was relinquished on 5/8/2008 (i.e. at end of licence year 4 - this EL still has one year of its term remaining). Geographic Locality: Olary Ranges;Footes Hill;Cutana Station;Tepco Station;Mingary Creek;Bulloo Creek Station;2006 Drew Hill JV Area Aerial EM (VTEM) Survey [part];2006 Drew Hill JV Area Aerial Magnetic Survey [part] Doc No: Env 11848

More +

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/mesac22051
Citation McDonald, A.;Snodin, S. 1909. Macdonald Hill, Mingary and Bulloo Creek (Drew Hill Project). First partial surrender/ second partial relinquishment reports at project licences' expiry/renewal, for the period 30/9/2003 to 29/9/2008. Mineral Company Report - Mineral Exploration
https://pid.sarig.sa.gov.au/document/mesac22051

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[140,-32.5],[141,-32.5],[141,-32],[140,-32],[140,-32.5]]]}
Purpose

                    
                    

                    
                  
Lineage