SADME/Amdel Project OD 1/1/285 : Treatment of Mount Torrens Battery tailings. Progress reports 1 to 3 for the period September 1983 to June 1984.
Downloads
Name | Description | Download | Select |
---|---|---|---|
SADME/Amdel Project OD 1/1/285 : Treatment of Mount Torrens Battery tailings. Progress reports 1 to 3 for the period September 1983 to June 1984. |
About this record
Record No | mesac24278 |
---|---|
Topic | Geoscientific Information |
Type of Resource | Document |
Category Type |
|
Document Type | External Publication - Laboratory Analyses |
Contributor | Amdel Ltd |
Sponsor | South Australia. Department of Mines and Energy;Wildy, R. |
Tenement | |
Tenement Holder | |
Operator | |
Geological Province | |
Mine Name | |
Stratigraphy | |
Commodity | |
Notes |
Geographic Locality: Central Mount Lofty Ranges;Mount Torrens Stamp Battery (disused);secn 6537, hd Talunga Doc No: Env 05352
|
Language | English |
Metadata Standard | ISO 19115-3 |
Use constraints | License |
---|---|
License | Creative Commons Attribution 4.0 |
Persistent identifier | https://pid.sarig.sa.gov.au/document/mesac24278 |
Citation | Capps, P.G. 1984. SADME/Amdel Project OD 1/1/285 : Treatment of Mount Torrens Battery tailings. Progress reports 1 to 3 for the period September 1983 to June 1984. External Publication - Laboratory Analyses https://pid.sarig.sa.gov.au/document/mesac24278 |
Status | |
---|---|
Maintenance and Update Frequency | |
Geographic Reference | GDA2020 (EPSG:7844) |
Geo bounding box | {"type":"Polygon","coordinates":[[[138.5,-35],[139,-35],[139,-34.5],[138.5,-34.5],[138.5,-35]]]} |
Purpose | |
Lineage |