Stony Hill. Combined annual/final report to licence full surrender, for the period 15/3/2016 to 14/3/2017.
Published: 17 Jan 1917 Created: 12 Nov 2024 Revised: 12 Nov 2024

No new work was carried out on the subject Stony Hill licence area during its past year. The South Australian Iron Ore Group Pty Ltd (SAIOG) has held this tenement (successively under ELs 3287/4451/5617) since 2/12/2004, but has now surrendered...

No new work was carried out on the subject Stony Hill licence area during its past year. The South Australian Iron Ore Group Pty Ltd (SAIOG) has held this tenement (successively under ELs 3287/4451/5617) since 2/12/2004, but has now surrendered it in full. The ‘iron ore rights’ for exploration done on the tenement have been held by Centrex Metals Ltd, while ‘other mineral rights’ have been held by Lincoln Minerals Limited. Since 2007, this tenement, along with other tenements within the western Middleback Range and the central Eyre Peninsula, has formed part of a Combined Reporting Group for the purposes of the Northern Amalgamated Expenditure Arrangement made with PIRSA. In brief, the total prior exploration conducted on this area has included: • In November 2005, an airborne magnetic and radiometric survey of 1635 line km • In 2007, an airborne magnetic and radiometric survey of 401 line km flown over the remaining southern portion of the tenement • In 2008, exploratory RC drilling of 24 holes for 2769 m, targeting iron ore • In 2008, surface geochemical sampling of calcrete • In 2009, geological mapping and rock chip sampling. In its iron ore exploration, Centrex focussed on the potential for DSO haematite, with a secondary consideration being magnetite and haematite BIF. Although the tenement area contains small amounts, in relative terms, of magnetite/haematite BIF, plus potentially significant amounts of low grade/marginal magnetite-rich granite, it is now believed that any future discovery of DSO iron ore will likely require significant exploration expenditure. The current economic climate is not favourable for iron ore, and Centrex believes that an improvement in the iron ore price to a level which might justify making such significant exploration expenditure is many years away. For this reason, the joint venture partners have decided to surrender the tenement in full.

More +

About this record

Record No mesac27328
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Mineral Company Report - Mineral Exploration
Contributor Centrex Metals Ltd
Sponsor
Tenement EL 5617
Tenement Holder South Australian Iron Ore Group Pty Ltd
Operator Centrex Metals Ltd;Lincoln Minerals Limited
Geological Province
Mine Name
Stratigraphy
Commodity
Notes
Geographic Locality: Western Middleback Range;Stony Hill
Doc No: Env 11449

Geographic Locality: Western Middleback Range;Stony Hill Doc No: Env 11449

Language English
Metadata Standard ISO 19115-3

Citations

Use constraints License
License Creative Commons Attribution 4.0
Persistent identifier https://pid.sarig.sa.gov.au/document/mesac27328
Citation Watts, A. 1917. Stony Hill. Combined annual/final report to licence full surrender, for the period 15/3/2016 to 14/3/2017. Mineral Company Report - Mineral Exploration
https://pid.sarig.sa.gov.au/document/mesac27328

Technical information

Status
Maintenance and Update Frequency
Geographic Reference GDA2020 (EPSG:7844)
Geo bounding box {"type":"Polygon","coordinates":[[[136.5,-33.5],[137.5,-33.5],[137.5,-32.5],[136.5,-32.5],[136.5,-33.5]]]}
Purpose

                    
                    

                    
                  
Lineage