Quarterly reports PEL 23 April 1985 - 1988.
Created: 12 Nov 2024 Revised: 12 Nov 2024

Drilling included 25 uphole velocity survey holes totalling 2349 metres and 3238 metres of experimental shothole drilling.

Drilling included 25 uphole velocity survey holes totalling 2349 metres and 3238 metres of experimental shothole drilling.

    Downloads

    Name Description Download Select
    ENV05073.pdf

About this record

Record No mesac28068
Topic Geoscientific Information
Type of Resource Document
Category Type
Document Type Energy Company Report - Annual licence or technical report
Contributor Comalco Aluminium Ltd
Sponsor
Tenement PEL 23
Tenement Holder Comalco Aluminium Ltd
Operator Comalco Aluminium Ltd
Geological Province Officer Basin
Mine Name
Stratigraphy
Commodity
    Notes
    Doc No: Env 05073
    Drillhole: SH1-SH25

    Doc No: Env 05073 Drillhole: SH1-SH25

    Language English
    Metadata Standard ISO 19115-3

    Citations

    Use constraints License
    License Creative Commons Attribution 4.0
    Persistent identifier https://pid.sarig.sa.gov.au/document/mesac28068
    Citation Weste, G. Quarterly reports PEL 23 April 1985 - 1988. Energy Company Report - Annual licence or technical report
    https://pid.sarig.sa.gov.au/document/mesac28068

    Technical information

    Status
    Maintenance and Update Frequency
    Geographic Reference GDA2020 (EPSG:7844)
    Geo bounding box {"type":"Polygon","coordinates":[[[131.5,-29],[134.5,-29],[134.5,-26.5],[131.5,-26.5],[131.5,-29]]]}
    Purpose
    
                        
                        
    
                        
                      
    Lineage